Dubai property maintenance contracts

Monthly & Annual Maintenance Packages

Compare structured AC, plumbing, electrical and property-maintenance plans for Dubai apartments, villas and small commercial premises.

Transparent planning prices

Choose a service level first, then confirm the property-specific scope.

The figures below are market-informed starting prices for planning and comparison. A written quotation must still confirm property size, AC units, systems, existing defects, visit frequency, emergency response, parts limits and service boundaries.

  • Monthly and annual payment options
  • Defined preventive visits and callouts
  • AC, plumbing and electrical coverage
  • Clear exclusions and quotation controls
Residential and small-business packages

Three practical levels of planned maintenance.

Annual payment reflects a lower effective rate. Monthly plans require an approved twelve-month agreement unless the quotation states otherwise.

Essential

Preventive Starter

For apartments and smaller properties needing scheduled checks and a controlled route for common faults.

AED 149/monthor from AED 1,590/year
  • 2 AC preventive-service visits per year
  • 1 plumbing inspection per year
  • 1 electrical inspection per year
  • 4 routine AC, plumbing or electrical callouts
  • Service report after scheduled visits
  • Priority booking during normal service hours
Quote Essential
Priority

Property Plus

For larger villas and operationally sensitive properties that need increased visit allowances and faster coordination.

AED 449/monthor from AED 4,790/year
  • 4 AC preventive-service visits per year
  • 2 plumbing and 2 electrical inspections
  • 12 routine MEP callouts
  • 4 minor handyman labour visits
  • Priority urgent-request coordination
  • Named service-coordination contact
  • Quarterly open-action review
Quote Property Plus
Pricing control: These are indicative starting prices, not automatic acceptance offers. VAT, replacement parts, consumables, specialist subcontractors, access equipment, after-hours work, major repairs and pre-existing defects are excluded unless a written quotation includes them.
Commercial and multi-site contracts

Business MEP packages require an asset-led quotation.

Restaurants, warehouses, offices, retail units, buildings and portfolios have different operating hours, asset loads, permit requirements and response expectations.

Small commercial

Office, shop or clinic plan

Scheduled AC, plumbing and electrical checks with a defined callout allowance, operating-hour coordination and service reporting.

Food service

Restaurant and commercial-kitchen plan

Coordinate MEP support with kitchen equipment, grease traps, drainage, hood cleaning and planned shutdown windows.

Industrial and logistics

Warehouse and workshop plan

Asset-led maintenance for electrical distribution, lighting, ventilation, plumbing, drainage, coatings and operational access.

Portfolio

Multi-site managed plan

One request route, site records, approval contacts, scheduled visits and consolidated reporting across several UAE properties.

Coverage matrix

What the package price does—and does not—normally cover.

ItemEssentialStandardProperty Plus
Scheduled AC visits2/year3/year4/year
Plumbing inspections1/year2/year2/year
Electrical inspections1/year2/year2/year
Routine MEP callouts4/year8/year12/year
Minor handyman labourQuoted separately2 visits4 visits
Replacement partsExcluded unless the written quotation states a specific allowance
Major breakdowns and pre-existing faultsInspected and quoted separately
Emergency responsePriority routingPriority urgent routingEnhanced priority coordination
Before contract approval

A low headline price is useful only when the scope is clear.

Compare providers by preventive-visit counts, emergency and routine callout definitions, response windows, labour hours, parts limits, exclusions, cancellation rules, reporting and the treatment of pre-existing defects.

No. They are starting prices for comparison. The final rate depends on property size, systems, AC-unit count, condition, service frequency, response terms, access and exclusions confirmed in writing.
Monthly pricing normally spreads an approved twelve-month contract across instalments. A quotation must confirm payment schedule, cancellation terms and any minimum commitment.
Not automatically. Filters, refrigerant, motors, capacitors, compressors, valves, pumps and other parts are included only when the written proposal lists a specific allowance.
Yes, but commercial and multi-site plans are quoted from asset lists, operating hours, shutdown restrictions, preventive frequencies, emergency expectations and reporting requirements.
Package quotation

Compare the package, then confirm the real property scope.

Send the property details, AC-unit count, current faults and required response level for a written monthly or annual proposal.

WhatsApp
WhatsApp